Dollar Tree Distribution Center – Connecticut

Overview

Clancy & Theys Construction Company signed a Design-Build contract for the 1,000,000 sq ft distribution center with approximately 15,000 sq ft of office and maintenance areas. The structure of the building is a concrete slab on grade, with conventional steel framing, and concrete tilt wall panels. The exterior is completely painted with a textured elastomeric coating. There is a separate fire pump house, equipped with two fire pumps, and guard house to support the facility. The distribution center’s peak is 45’-0” clear with a minimum of 37’-0” clear around the perimeter for the internal Racking and Conveyor systems. ESFR sprinkler system. The project was completed on a fast-tracked, 10-month schedule.

Project Details
Client: Dollar Tree, Inc.
Location: Windsor, Connecticut
Size: 1,000,000 sq ft
Share this project:
It is the nature of construction to experience problems while any project is underway, whether it comes in form of design, constructability, materials, labor, logistics or weather. Clancy & Theys is one of the few General Contractors and Construction Managers that we have worked with whom consistently anticipated potential problems and worked as a team with their suppliers and subcontractors to plan around or resolve the problem, before it had any effect of safety, quality, production or schedule.
David M. Somero | President | S&S Concrete Floors, Inc.