Skip to main content

Dollar Tree Distribution Center – Connecticut

Overview

This design-build project included the construction of a 1,000,000 SF distribution center with approximately 15,000 SF of office and maintenance areas. The structure of the building is a concrete slab on grade, with conventional steel framing and concrete tilt wall panels. The exterior is completely painted with a textured elastomeric coating. A separate fire pump house has two fire pumps and a guardhouse to support the facility. The distribution center’s peak is 45’-0” clear with a minimum of 37’-0” clear around the perimeter for the internal Racking and Conveyor systems. ESFR sprinkler system. Clancy & Theys completed the project on a fast-tracked, 10-month schedule.

Project Details
Client: Dollar Tree, Inc.
Location: Windsor, CT
Architect: HBA Architecture & Interior Design
Size: 1,000,000 SF
Key Engineers:
RTB Engineering
Ed Lally and Associates
Sigma Psi Consulting
Share this project:
It is the nature of construction to experience problems while any project is underway, whether it comes in form of design, constructability, materials, labor, logistics or weather. Clancy & Theys is one of the few General Contractors and Construction Managers that we have worked with whom consistently anticipated potential problems and worked as a team with their suppliers and subcontractors to plan around or resolve the problem, before it had any effect of safety, quality, production or schedule.
David M. Somero | President | S&S Concrete Floors, Inc.