This 709,000 SF fast-track, design-build project was completed in just 310 days. The single-story, state-of-the-art cartridge manufacturing facility incorporated an office with conference rooms, machining, manufacturing, production, and laboratories. The project included robotics and other automation equipment, a clean room with multiple HEPA fans, and conductive/chemical-resistant epoxy flooring. Construction consisted of slab-on-grade and a steel frame with an insulated metal panel exterior. The scope of work included 40 acres of site clearing and improvements, with lakes and a BMP retention pond.
Additionally, this project consisted of the complete build-out of the 20,000 SF of space to contain a Class 1000 clean room for manufacturing. Work was performed inside the existing manufacturing facility and included concrete demolition, structural steel framing, high-speed doors, suspended steel framing to support HVAC equipment, epoxy flooring, high-density wall and ceiling protection, wall and ceiling finishes, new electrical power for the project, the manufacturing equipment, and an FM-200 fire protection system.